Pages

Tuesday, September 17, 2013

Finished at Last

The kitchen is finally finished. It took a lot longer than expected due to various dramas in our contractor’s life, but it is finished. Have a look.

Sept 17, 2013: Finished range/refridgerator wall. The toaster oven will sit under the microwave
Inside wall. Toaster oven will go below the microwave, knife blocks
between it and stove, cutting boards between it and fridge

Sept 17, 2013: The finished sink wall. The coffee maker will  live on the near end of the counter
Coffee maker will be on the end of the counter, the rest of this counter
will remain (mostly) empty. Except for dirty dishes, of course

2013_09_17 4 finished kitchen
The overall picture shows the new kitchenette light fixture.
We still need to center it on the table

Sept 17, 2013: New overhead lights for the living room and foyer. *Much* nicer looking
Living room and foyer lights. I was only so-so on them when selected,
but it turns out I like them very much in situ

2013_09_17 9 dining room chandelier
And the dining room chandelier. It, too, needs to be centered over the table.
Once we figure out where “center” is, Ken will install a white ceiling hook
and we’ll loop the chain over

 

[written 1/16/14]