Pages

Wednesday, August 7, 2013

Kitchen in a Box

Lighting fixtures have been ordered and the cabinets and appliances have arrived. Let the fun begin.

Here are the lighting fixtures I selected:

Quorum Hemisphere chandelier  CQTE
Quorum Hemisphere chandelier

Quorum Hemisphere pendant CQUJ
Quorum Hemisphere pendant

 

I found the Quorum Hemisphere collection on my own but didn’t like the ceiling mounts. So Jessie helped me find a compatible collection. The living room and foyer fixtures are the same, just different sizes.

Dolan Fireside 36DL foyer
Dolan Fireside semi-flush mount

And the cabinets/appliances. Good thing we did have that fireplace removed.

Aug 6, 2013: The cabinets have arrived. Good thing we had the fireplace removed
Cabinet boxes stacked in the former fireplace area

Aug 7, 2013: Appliances have arrived! Refrigerator in the foyer
And in the living room. The fridge will be sitting right there for the duration

Aug 7, 2013: Appliances have arrived! Dishwasher and stove outside on the patio
Dishwasher and stove have to sit outside

Our contractor won’t be available for another week or so and I’m off to Michigan for a family reunion next week. So Ken will have the lovely task of emptying the cabinets and getting things ready. Hopefully most of the demolition and other dirty stuff will be done by the time I get back.

 

[written 1/15/14]

No comments:

Post a Comment